Transmission Line

Transmission Line Length4 km
Voltage Level33 kV, Double Circuit
Receiving End Upper madi Switchyard
Connection Point with NEA Lekhnath Sub-station, Kaski
Transmission from Upper Madi to Lekhnath
Length 10.2 km
Voltage 132 kV, Double Circuit
Licensed for 91 MW (Upper Madi 25 MW, Namarjun Madi 12 MW, Super Madi 44 MW, Madkyu 10 MW)
Status Construction completed (2016)
Constructed by Upper Madi Hydropower Project
Cost for HHPL Proportionate to voltage level